In a condo, the kitchen answers to the building before it answers to you. What the Condo Act actually says, what real Toronto buildings ask for, the five design decisions the building makes for you, and how the whole kitchen gets up the elevator.
The cabinets are chosen, the countertop is booked, and the property manager has just replied to your email asking for your contractor’s licence, a WSIB clearance certificate, a liability insurance certificate and a description of the work — and has mentioned that approval can take up to a month. Nobody brought any of this up while you were picking door colours. In a house, a kitchen is a matter between you, your contractor and sometimes the city. In a condo there is a fourth party, the corporation, and its paperwork sits in front of everything else.
Everything below comes from one of three places, and it helps to know which, because they are enforced by different people.
The second rulebook is the one people skip, and it is the one the property manager will quote back to you. Ask management for the declaration, the by-laws, the rules and the renovation form before you order anything. Read the parts that mention renovations, alterations, contractors, noise, elevators, flooring and plumbing. It is an evening, and it decides more about your kitchen than the showroom does.
What they search at midnight “condo renovation rules toronto” — usually right after the management office has replied to a question that was meant to be a formality.
A common assumption is that the Condo Act requires board approval for any renovation. It does not say that directly. The section people quote, section 98, is about changes to the common elements. Approval for work inside your unit comes from your own building’s declaration and rules — which, in practice, almost always ask for it. The Condominium Authority of Ontario’s guidance: “Unit owners generally must make a request to their board to have the renovation approved and may also need to have work approved by the municipality.”
How broad the requirement is depends on the wording. One downtown Toronto building’s renovation form (TSCC 2516) reads: “No wall, floor, door or window, toilet, bathtub, washbasin or sink, heating, air conditioning, plumbing or electrical equipment … shall be installed, removed, extended or otherwise altered in a unit … without the prior written consent of the Corporation.” Cabinets are not on that list. The sink is — and so are the floor, the plumbing and the electrical. A kitchen renovation that touches none of those is hard to imagine.
Then there is the line between your unit and the building. The CAO describes common elements as “shared areas of the condo property, like hallways, elevators, piping, amenities, etc.” Where exactly your unit ends is set by your declaration, so it varies, but shared drains and risers are the obvious candidates in a kitchen. A change to the common elements needs a board resolution and a written agreement with the corporation that is registered against your unit’s title, and that agreement “binds the owner’s unit and is enforceable against the owner’s successors and assigns” — in other words, the next owner inherits it.
The CAO again: “Typically, any changes that impact the structural integrity of the building, contravenes the governing documents or affects other owners safety are not likely be approved.” In a concrete building, that line usually runs through the slab. Read section 03 before you draw an island.
No two buildings use the same form, but the published policies we read for four Toronto corporations, and the CAO’s own summary, ask for the same handful of things. The CAO: “some condo corporations may require a formal process and application to be submitted, some may require insurance information from contractors, as well as pre and post inspections.”
“Renovate kitchen, new cabinets and counter” is the description that comes back with questions. A plan and a set of elevations answer most of them at once — what goes where, which wall, and above all that the sink is staying where the drain is. That is what our planner is for: draw the real room, place real catalogue cabinets at the sizes that exist, then ⬇ Export a PDF with the top view, the countertop dimension drawing, a 3D view and the elevations. It runs in a browser tab, it is free, and you can start without an account. It will not fill in your building’s form for you; it will make the attachment the form asks for.
These are the places where a condo kitchen stops being a design question and becomes a building question. Each one changes a cabinet, so settle them before the layout is final.
Condo kitchens are usually small and often a single wall or a galley, so every inch of the run counts. Small kitchen layouts that work.
Everything — the cabinets, the countertop, the appliances, the tools and the old kitchen on its way out — goes through the service elevator, and the elevator has a calendar. One building’s form: “Resident must book the service elevator with the Front Desk for transport of all large loads of tools, equipment and/or materials or for the removal of debris.” Another asks for the booking “no less than three (3) days in advance, so that elevator pads on the day of renovations, can be installed.” A third wants the concierge to inspect the elevator “immediately prior to using” it, with protective pads in place.
Toronto’s noise by-law (Municipal Code Chapter 591) prohibits clearly audible construction noise from 7 p.m. to 7 a.m. on weekdays, before 9 a.m. and after 7 p.m. on Saturdays, and all day on Sundays and statutory holidays — and its definition of construction equipment includes “hand tools, power tools.” Condo rules are often narrower. These are the hours from published rules of three Toronto buildings:
| Source | Weekdays | Saturday | Sundays & holidays |
|---|---|---|---|
| City of Toronto by-law | 7 a.m.–7 p.m. | 9 a.m.–7 p.m. | No construction noise |
| TSCC 2516 (downtown) | 9–5; heavy or noisy work 10–5 | 9–5; heavy or noisy work 10–5 | No work |
| YCC 50 (North York) | 9 a.m.–7 p.m. | 10 a.m.–6 p.m. | Not listed |
| TSCC 1519 (Yorkville) | Noisy work 9–5 | No noisy work | No noisy work |
On top of both, the Condo Act prohibits unreasonable noise in a unit no matter what the rules say. Outside Toronto, Mississauga, Markham, Vaughan and the other GTA municipalities each have their own noise by-laws, and the building’s rules still apply on top. Plan the loud days — demolition, drilling for the wall rail, cutting filler strips — inside the building’s window, and do the quiet work, like assembling flat-pack boxes and adjusting hinges, around it.
Board approval is not a building permit, and a building permit is not an electrical notification. Toronto’s own list of work that does not need a building permit includes “Installation of cabinetry and millwork” and “Repairing and replacing plumbing fixtures.” Its list of work that does includes alterations “such as adding or removing walls” and work to “Install or modify heating and or plumbing systems.” The CAO summarises the same idea: “Typically, municipalities require permits for renovations requiring structural changes, modifications to plumbing and electrical systems and exterior changes.”
Electrical work is a separate track run by the Electrical Safety Authority, not the city. In ESA’s words: “Having a building permit isn’t the same as filing an electrical notification. You may need both.” ESA allows owners to do electrical work in their own home if they file a notification, and says that if you hire someone, “it must be a Licensed Electrical Contractor.” A condo can be stricter: TSCC 2516 requires a licensed electrician and a copy of the passed ESA permit, and a licensed plumber for all plumbing.
The full permit picture for Ontario and the GTA, city by city.
A kitchen is where a condo renovation is most likely to put water where it should not be, and the Act is specific about the money. If an owner, or someone living in the unit, “through an act or omission causes damage to the owner’s unit,” the lesser of the repair cost and the corporation’s insurance deductible is added to that unit’s common expenses (section 105) — and a by-law can widen that. Your contractor’s mistakes are your responsibility to the building too, because section 119 makes you take reasonable steps to see that your agents comply with the rules.
The new kitchen itself may not be covered by the building’s policy at all. The corporation’s duty to repair after damage “does not include the obligation to repair after damage improvements made to a unit,” and its duty to insure excludes them too. What counts as an improvement is measured against your building’s standard unit definition. The CAO: “Owners are responsible for decorative and non-standard unit elements,” and an owner’s insurance “would need to cover improvements made to their unit.” Ask management for the standard unit definition, then call your insurer before demolition, not after.
If every line is true, the rest of the job runs in the same order as any kitchen. Here is that order, step by step.
Rules quoted from individual buildings are examples of common practice, not law, and they change; your own building’s documents are the ones that apply. Checked October 2026.
Almost always, though the requirement usually comes from your building’s declaration and rules rather than directly from the Condo Act. The Condominium Authority of Ontario says unit owners “generally must make a request to their board to have the renovation approved and may also need to have work approved by the municipality.” Some buildings’ rules list sinks, plumbing, electrical and floors among the things that cannot be altered without written consent.
Section 98 covers changes to the common elements, not the inside of your unit. If your kitchen work touches the common elements, such as shared piping, it needs a board resolution and an agreement with the corporation registered against your unit, which binds future owners. Work inside the unit is controlled by your building’s declaration, by-laws and rules.
Sometimes a short distance, rarely far. In concrete buildings the drain usually cannot be buried in the slab; one Toronto building’s rules require all new drain work to sit above the concrete and forbid chipping or cutting it. A drain has to slope to the stack, so a sink moved along the same wall may work, while an island sink across the room usually does not. Ask management before you design around it.
It depends on the building. At least one Toronto corporation allows only recirculating hoods with filters and forbids venting into the building’s ventilation system. Ask before you choose the hood, because a ducted and a recirculating hood change the cabinet above the range differently.
The city’s noise by-law allows construction noise from 7 a.m. to 7 p.m. on weekdays and 9 a.m. to 7 p.m. on Saturdays, and none on Sundays and statutory holidays. Condo rules are often narrower: published rules we read set hours such as 9 to 5 on weekdays, with heavy or noisy work limited further. Your building’s rules are the ones you will be held to.
For cabinets alone, generally not: Toronto lists installing cabinetry and millwork and replacing plumbing fixtures as work that needs no building permit. Adding or removing walls, or installing or modifying plumbing, does. Electrical work is reported separately to the Electrical Safety Authority, and many buildings require licensed trades for both plumbing and electrical.
Under section 105 of the Condo Act, if an owner or occupant causes damage to their unit, the lesser of the repair cost and the corporation’s insurance deductible is added to that unit’s common expenses, and a by-law can extend this. The corporation also does not insure or repair improvements to a unit, so your own policy needs to cover the new kitchen.
Flat-packed cabinets travel as cartons and are assembled in the suite, which is usually easier than moving built cabinets. The pieces to check are the long ones: tall pantry or oven cabinet sides, end panels and the longest countertop section. Measure the elevator door and cab, including the diagonal, before you order, and book the service elevator for delivery.
It varies by building. One Toronto corporation’s form warns that approval may take up to thirty calendar days. Apply before the cabinets are ordered, so a refusal of one detail does not strand an order.
Plan the kitchen around the sink position the building will allow, check it in plan, 3D and elevation, and export the drawings your application asks for. Free, in a browser.