The Cabinets Arrived Damaged, Short, or Wrong

The truck has gone, the garage is full of cartons, and one of them has a crushed corner — or a box you were counting on is not there at all. Here is what to check, in what order, and what to send so it gets sorted rather than argued about.

📦 Delivery day⏱ 12 min read🔄 Reviewed October 2026
Also in: 中文 · Français

A flat-pack kitchen arrives as a pallet of cartons that has been lifted, strapped, loaded, driven and lifted again. Most of it survives perfectly. When something does go wrong, the outcome is decided in the first hour more than in any later conversation: what you wrote on the receipt, what you photographed, and whether you built the damaged part before anyone saw it. None of that is complicated. It just has to happen in the right order, on the day.

The short answer

At the truck, count the cartons and write any visible damage on the delivery receipt before you sign, then photograph the pallet as it arrived. Unbox everything that day and check each carton against your order. Don’t assemble a damaged panel. Then contact your Flip Kitchen sales rep with the order number and photos of the carton, the label and the damage. A quality defect is replaced. Damage done in transit is between you and the carrier, because the freight is booked with them — which is why the receipt note matters.

01 At the truck

Sign last, after you have looked

The delivery receipt is the one document everyone will ask for later. Whatever you sign without comment reads as “arrived in good condition”, so the order of events at the kerb is: count, look, write, photograph, sign.

  1. Count the cartons against the packing listNot the cabinets — the cartons. A single base cabinet can be two or three boxes (the carcass, the doors, a drawer kit), and long parts such as fillers, end panels and toe kick often travel in their own slim cartons. If the count is short, say so on the receipt.
  2. Walk round the pallet before it comes off the truck if you canLook at every face you can see: crushed corners, punctures, a carton that has been opened and re-taped, wet patches, a stack that has slumped to one side. Forks leave a very particular wound — two parallel slots low on one side — and it is worth looking for.The tellA carton that rattles when you tilt it, or one with a dent you can push your fist into, is the one to open first.
  3. Write what you see, specifically“Damaged” is too vague to be useful. “Two cartons crushed at one corner, one punctured on the long side, contents not yet inspected” is what helps later. Writing “subject to inspection” on its own rarely carries weight; a description does.
  4. Photograph it as it arrivedThe whole pallet from each side, then each damaged carton close up with its label in the frame. Take the pictures before anything is moved, with the truck or the driver in the background if you can. A date on the photo does the rest.
  5. Then signYou have recorded what you can see. What you cannot see yet is what the next hour is for.
Should you refuse it?

Rarely the whole delivery. Refusing sends every good carton back along with the bad one, and leaves you with an empty kitchen and a longer wait. Accept it with the damage written down. The exception is a pallet that is plainly destroyed — tipped, soaked, or broken open — and then the right first move is a phone call to the carrier before you sign anything.

02 The same day

Unbox everything the day it lands

Not the morning you plan to install. Damage you find three weeks later is hard to pin on anyone, and a missing part found on install day stops the job with the old kitchen already in the skip. Clear a dry floor, open the cartons one at a time, and work through each one before you open the next, so parts never wander between boxes.

  • The label against the order. Every carton carries the cabinet code — B18, SB36, W3030 and so on. Tick each one off against your order and your plan. A code on the label that is not on your order is the first thing to report. How to read the codes.
  • The colour and the style. Open each door carton far enough to see a face. A door in the wrong colour, or a Shaker profile where you ordered flat, is easiest to sort before anything is built.
  • The panel count. The parts list in the carton names every panel: sides, bottom, back, rails, shelves. Lay them out and count. A panel can hide flat against the carton wall.
  • The hardware bag. Every box has one, and what is in it depends on how the box is built — more on that below. Check it is there; do not empty it into a common pile.
  • The faces, under a raking light. Hold a torch low across each door and end panel. Dents, scratches and chips that vanish under a ceiling light jump out when the light skims the surface.
  • The edges. Run a finger along the edge banding on doors and front edges. It should be tight and continuous, with no lifting at the corners and no swelling underneath.
  • The drilled holes. The rows of small holes up the inside of each side panel, the hinge cups in the doors, the runner holes for drawers. They should be clean, in line, and on the side they belong. Machining that is missing, mirrored or plainly in the wrong place is not something to work around.

Keep every carton and every piece of packing until the job is finished and every report is closed. A damaged part goes back in its own carton with its label, exactly as it came.

03 Transit or defect

Was it the truck or the factory? It decides who sorts it

This is the distinction that matters most, and it is worth being plain about why: a quality defect is replaced by Flip; damage done in transit is not. Flip does not run the truck — the freight is booked with a carrier — so anything the journey did is between you and that carrier. Most cases sort themselves the moment you look at the carton and the part side by side.

What you seeThe cartonMost likelyWho to talk to
A chipped or crushed corner on a panelCrushed at the same cornerTransit damageThe carrier — with your receipt note and photos
A dent or a puncture in a facePunctured at the same spotTransit damageThe carrier
Swollen edges, a water stain, a warped panelWet, stained or softGot wet on the wayThe carrier
Holes missing, mirrored or in the wrong placeFineQuality defectYour Flip sales rep — replaced
Edge banding lifting, a face peeling, a crack in the boardFineQuality defectYour Flip sales rep — replaced
A panel missing from a carton that arrived sealedSealed, intactPacking errorYour Flip sales rep
The wrong code, colour or size on the labelFineA packing or an ordering mistake — check your orderYour Flip sales rep

The carton is the evidence. A crushed carton with a crushed panel inside tells its own story; a perfect carton with a faulty panel inside tells a different one. That is the reason to photograph the two together, with the label showing, before the carton goes in the recycling.

04 Does it matter

Damage you can live with, and damage you can’t

A kitchen hides a great deal of every cabinet. Before you decide a scratch is the end of the world, work out where that face will end up.

  • Usually hidden. The outside of a side panel that will sit against the next cabinet, the back panel, the underside of the bottom, the back edges against the wall, the top rails under the countertop. A scuff there is a cosmetic call you can make yourself — record it anyway.
  • Always on show. Door and drawer faces, their edges, finished end panels, the exposed side of the last cabinet in a run, and the front edges of the box itself. On a frameless cabinet the ¾″ front edge of each panel shows in the gap between doors, so a chip there is visible every day.
  • Structural, whatever the looks. A crack through a panel, a chip that takes out a drilled hole, a corner broken where a joint goes, a bent drawer runner. These parts hold the box together or carry a door; they are not cosmetic, and they are not to be built.

Doors deserve their own look. A door has a show face and a back face, and on a full-overlay frameless door the back face is visible every time the cabinet is open. A scratch on the back of a pantry door you open twenty times a day is not hidden. A mark on the back of a door that will sit behind the fridge panel probably is.

If you decide to use a part with a hidden scuff, it is your decision to make — just make it with the photos taken and the report sent, so nobody wonders later.

05 Hands off

Don’t build the damaged panel

It is tempting to build around a chip and get on with it. Resist. Once a panel is screwed into a box, three things change. Nobody can see the damage as it arrived any more, only as it is now. Assembly loads the panel, so a hairline crack can open up or a chipped edge can crumble further. And the written warranty excludes damage that happens before or during installation — a part you knowingly built in is very hard to argue about later. The warranty terms are here.

Found it halfway through a build? It happens: a hole that isn’t where the screw wants to go, a panel that chips as the first screw goes in, a crack that only shows once the board is under load. Stop at that point. Don’t force the screw, don’t drill a new hole and don’t finish the box “to see”. Photograph the part where it is, with the box around it, then back the screws out and photograph it again on its own. A defect found during assembly is still a defect, and it is much easier to show when the evidence hasn’t been built over.

The same goes for a part that looks right but won’t go together: a cam that won’t pull a plywood joint tight, a dowel hole drilled too shallow, a runner that sits proud of its neighbour. Check the parts list and the orientation once — a panel the wrong way round is the usual cause, and the assembly page shows how to spot it — and if it still won’t, treat it as a defect and report it.

So: set the damaged part aside in its carton with its label, report it, and build the rest. Every other box in the kitchen can be assembled while you wait. A replacement panel also goes into an unbuilt box far more easily than it replaces one inside a built cabinet.

06 Reporting it

What to send, so it is sorted in one message

Damage and shortages go to your Flip Kitchen sales rep — the person who took the order — or through the contact page if you are not sure who that is. One complete message moves faster than five partial ones. Put in it:

  1. The order numberAnd your name as it is on the order.
  2. The cabinet code and a photo of the carton labelThe label ties the part to the order. Without it, “the second base on the left” means nothing to anyone but you.
  3. Photos of the carton and the partThe carton from the outside showing any damage, then the part on its own: one wide shot so the panel can be identified, one close-up with a tape measure in the frame for scale.
  4. The name of the panelFrom the parts list in the carton — left side, bottom, door, drawer front.
  5. Whether the carton was damagedAnd a copy or a photo of the delivery receipt with your note on it.
A message that gets sorted first time

“Order 12345, delivered Tuesday. Carton labelled SB36 arrived crushed at the bottom-left corner (photo 1, receipt note photo 2). Inside, the left side panel is chipped at the same corner, about 1″ across (photos 3–4, tape in shot). Not assembled. Separately, carton W3030 arrived sealed and intact, but the right-hand door has edge banding lifting along the hinge edge (photos 5–6).” Two problems, two causes, one message — and nobody has to ask a follow-up question.

For transit damage, the same photos and the receipt are what the carrier will want. Ask the carrier what they need and by when, as soon as you find it — carriers generally expect damage to be raised quickly, and the clock started when you signed.

07 Missing parts

Before you report it missing, look in three places

Most “missing” parts turn up. Before you send the message, check:

  • Inside other cartons. Hardware bags get taped inside the carcass carton, tucked into a drawer box or wedged between panels. Shelves sometimes travel in a different carton from their cabinet.
  • In their own cartons. Doors, drawer fronts, fillers, end panels and toe kick are often packed separately from the boxes they belong to. Check the packing list for long, slim cartons.
  • On the parts list. Sometimes the part is there under a different name than you expected. Lay out the contents against the list in the carton, item by item.

What is in each hardware bag depends on how the box is built. Plywood boxes go together with cam locks and dowels; particleboard boxes are screwed together, so their bag holds the assembly screws instead. If you have both kinds in one kitchen, keep each bag with its own box.

Not missing: the joining and the installation screws

The screws that join one cabinet to the next, and the screws that fix cabinets to the wall, are not in any box — they are not supplied, because installers each have their own preference. Buy them before install day: 30 mm screws for joining through two ¾″ sides, and 2½–3″ cabinet screws into the studs. The installation chapter lists the rest of the kit.

08 The wrong box

Wrong size, wrong colour, wrong hand

Before you call a cabinet wrong, put three documents side by side: the label on the carton, your order, and your plan. They tell you which kind of wrong it is.

  • The label doesn’t match the order. It was packed wrong. Report it with a photo of the label, and leave the box unopened if you can.
  • The label matches the order, but not the plan. The order was wrong — a W3030 where the plan said W3036, say. Talk to your sales rep about it before you open or build that box; what can be done depends on the part, so keep it in its carton.
  • The door opens the wrong way. Often not a wrong cabinet at all. A single door’s hinge cups are bored on one edge, so the door turns over to hinge from the other side — that works when the door looks the same both ways up, and not when it has a grain direction or a shaped detail. The fix is in the Q&A.

If the plan was the problem all along, check the replacement on the plan before you order it. The free planner shows what fits the gap, including the filler you will need, before anything else is shipped. When the run doesn’t fit the wall covers the arithmetic.

09 Meanwhile

Store it properly, and keep installing around the gap

A replacement takes time to arrive. Three things keep that from becoming a second problem.

  1. Store the rest dry, flat and indoorsLay flat cartons on a level surface off the concrete, not leaning against a wall where they will bow. Keep them out of any room being drywalled, painted or tiled, away from exterior walls in a cold snap, and leave the doors packed until you hang them. Particleboard and melamine edges take on moisture in a damp basement or a cold garage, and then they swell.
  2. Install the run, and leave the gap exactA missing box in the middle of a run need not stop the job: hang and join everything else, and leave the opening to the replacement’s real width, checked with a tape at the top and the bottom.The exceptionThe corner cabinet. Every run is measured from it, so if the corner box is the one missing, wait for it rather than guessing.
  3. Hold the countertopDon’t book the template visit until every box is in, levelled and joined. The fabricator measures the cabinets as they stand, and a gap where a cabinet will be is a guess they won’t make. What they check on template day.
? People also ask

Straight answers

What do I do if my kitchen cabinets arrive damaged?+

Before you sign, write the damage on the carrier's delivery receipt and photograph the pallet and cartons as they arrived. Unbox everything the same day and check each carton against your order. Do not assemble a damaged panel. Then contact your Flip Kitchen sales rep with the order number and photos of the carton, the label and the damage. Quality defects are replaced; damage done in transit is a matter for the carrier.

Should I refuse a damaged delivery?+

Usually not the whole delivery. Refusing sends good cartons back along with the bad one and leaves you with nothing to install. Accept it, but write exactly what you see on the delivery receipt before you sign, such as two cartons crushed at one corner, and photograph it with the driver still there. If the pallet is plainly destroyed, call the carrier before signing anything.

Who pays for shipping damage on flat-pack cabinets?+

Not the cabinet maker. Flip Kitchen does not run the truck: the freight is booked with a carrier, so damage done in transit is between you and that carrier. That is why the note on the delivery receipt and the photos matter so much. Flip does replace quality defects, such as wrong machining or a faulty panel in an undamaged carton.

Is a chip on a new cabinet covered?+

It depends on what caused it. A chip at the same spot as a crushed or punctured carton is transit damage and goes to the carrier. A defect in an undamaged carton, such as lifting edge banding, holes drilled in the wrong place or a panel that is not what you ordered, is a quality problem, and Flip replaces it. Report either one through your sales rep with photos.

Parts are missing from my flat-pack cabinet. What now?+

First check the usual hiding places: hardware bags taped inside another carton or packed in a drawer box, doors shipped in their own cartons, and long parts such as fillers, panels and toe kick in separate boxes. Also check the parts list in the carton. If a part is really missing, contact your sales rep with the order number, the cabinet code and the name of the missing part.

Are screws included with kitchen cabinets?+

The fittings to build each box are in its hardware bag: cam locks and dowels for plywood boxes, assembly screws for particleboard ones. The screws that join one cabinet to the next and the screws that fix cabinets to the wall are not included, because installers each use their own. Plan on 30 mm screws for joining and 2 1/2 to 3 inch cabinet screws into the studs.

I ordered the wrong size cabinet. What can I do?+

Check first whether it is wrong: compare the code on the carton label with your order and with your plan. If the label matches the order but not what you meant, the order was wrong; if the label does not match the order, it was packed wrong. Either way, contact your sales rep before you open or build that box, and keep it in its carton.

How should I store flat-pack cabinets before installing them?+

Indoors, dry and flat. Lay the flat cartons on a level surface off the concrete, never leaning against a wall where they can bow, and keep them out of rooms being drywalled, painted or tiled. Leave the doors in their packaging until you hang them. A cold garage or a damp basement is the wrong place for particleboard and melamine edges.

Can I keep installing while I wait for a replacement cabinet?+

Usually yes, as long as the missing box is not the corner cabinet, which everything else is measured from. Install the run, leave the gap exactly to size and check it with the replacement's real width. Do not book the countertop template until every box is in, levelled and joined, because the fabricator measures the cabinets as they stand.

Your turn

Write it down at the truck. Photograph it before you build it.

Those two habits settle almost every delivery problem before it becomes an argument. Then check the plan once more, in the free 3D planner, before anything is re-ordered.